Selection guide
Remote I/O network selection for a modular ControlLogix cell
Short answer
Default to EtherNet/IP adapters at each section, DeviceNet for sections that are small device clusters, ControlNet only where an update must land in a scheduled window, and legacy Remote I/O only for installed 1771-style hardware. Size the Ethernet option by connection count: twelve adapters take twelve TCP connections. Keep each section's address with the section and map positions in one table.
On this page
- Which network should a movable ControlLogix cell use?
- What changes when a section moves?
- How does EtherNet/IP keep a moved section online?
- Example: how many 12-section cells fit on one 1756-ENBT port?
- When does DeviceNet beat Ethernet for a section?
- Is ControlNet worth the scheduling overhead for a movable cell?
- Should legacy Remote I/O stay on the list?
- How do you keep a section's identity separate from its position?
- What is the decision for each case?
- Questions asked
Put EtherNet/IP adapters on every section of a movable cell as the default choice, keep DeviceNet for sections that are small device clusters, schedule ControlNet only where an update must land inside a fixed window, and keep legacy Remote I/O only where installed hardware already runs it. The ordering comes from what a move disturbs: on EtherNet/IP the section carries its address with it, while the other three tie addresses or schedules to the network design. Below are the documented limits for each option, the arithmetic that sizes an EtherNet/IP port for a twelve-section cell, and the decision for each case.
Which network should a movable ControlLogix cell use? #
Default to EtherNet/IP adapters at every section, add DeviceNet where a section is a cluster of drives and sensors, choose ControlNet only where an update must land inside a scheduled window, and keep legacy Remote I/O only where 1771-style I/O blocks already exist. Everything else in this article is the reasoning behind that order and the limits that police it.
What a move disturbs is the whole selection. A network that treats identity as portable lets a section change position without a configuration change; a network that binds identity to a fixed trunk, schedule or scanner map makes every move a configuration event. The table compares the four candidates on exactly that basis, plus the hard limit you check before committing.
| Network | What a moved section keeps | Hard limit to check before committing | Choose it when |
|---|---|---|---|
| EtherNet/IP | Its IP address and its I/O connection | TCP and CIP connections on the Ethernet module; a 1756-ENBT documents 64 TCP and 128 CIP | The plant already runs industrial Ethernet and SCADA reads the sections |
| DeviceNet | Its node address | 64 nodes per the DeviceNet specification; trunk of 500 m at 125 kbit/s, 250 m at 250 kbit/s, 100 m at 500 kbit/s | A section is a small cluster of devices, not a rack of I/O |
| ControlNet | Its node address and scheduled connections | 99 nodes; 5 Mbit/s; coax trunk up to 1000 m | An update must land inside a scheduled window every cycle |
| Legacy Remote I/O | Its rack and group address | Link speed of 57.6 or 115.2 kbit/s; adapters sized as quarter, half or full racks | Installed 1771-style I/O blocks stay in service with crews trained on them |
Read the table as a filter, not a score. Strike the networks whose choose-it-when row you cannot honestly tick for this cell, then size the survivor with the arithmetic in the example below.
What changes when a section moves? #
Three things can change when a section moves: the cable lands somewhere new, its network address travels with the section, and its process role comes from a mapping table. The network you pick decides how much of that you must reconfigure by hand, so fix the policy before buying anything.
Start from a written inventory of one section: point counts by signal type, the response the machine sequence actually requires, whether sections move only at a controlled shutdown, and what the plant already provides in switches and spare capacity. Point count alone never decides a network. An input that feeds an indicator and an input that starts a time-critical sequence can sit on the same adapter while setting very different update requirements, so derive the response target from the sequence, not from a data sheet.
Then fix the identity policy before anyone assigns an address. If identity follows the section, each section ships with its own address and the program maps that section into the position it now occupies. If identity follows the position, a relocated or replacement section must take on whatever address and configuration the position expects, which means a compatibility check on every move. For a cell that reconfigures often, take the first policy: it turns a move into one edited assignment instead of a network rework.
Keep the physical I/O interface separate from the sequence logic. Each section exposes a fixed tag structure, the sequence logic reads only that structure, and a position table ties section identity to cell position. That split is what the rest of this article assumes.
How does EtherNet/IP keep a moved section online? #
The section keeps its IP address and its controller-side connection, so moving its patch cable to any free port on the same switched network changes nothing the controller can see; what you must check instead is the connection count on the Ethernet module, where the documented limit sits.
Run one switched port per section. A moved patch lead onto a free port leaves addressing and controller configuration untouched; what breaks movable cells is chaining sections through a device that was never meant to be a switch, the classic lockup described in why an industrial gateway locks up when used as a network hub.
Size the connection count next. The limit lives in the communication module rather than the controller, so read the technical data for the exact module fitted before committing; a 1756-ENBT's documented connection counts are in the table above. Each 1794-AENT adapter consumes one TCP connection for its implicit I/O messaging, which makes the counting simple: count adapters, not points. Higher-capacity 1756 EtherNet/IP modules publish larger counts of their own, and the same method sizes them.
Example: how many 12-section cells fit on one 1756-ENBT port? #
Fifteen of the 64 TCP connections on a 1756-ENBT are taken by twelve adapter sections, a SCADA client and a programming laptop, leaving 49 connections and room for about four more identical cells before the module's documented limit stops you.
Illustrative count for a twelve-section cell with one adapter per section, a SCADA client and a programming laptop:
- I/O messaging: 12 adapters x 1 TCP connection each = 12 connections
- Clients and tools: 2 connections for the SCADA client + 1 for the programming laptop = 3
- In use: 12 + 3 = 15 TCP connections
- Spare: 64 - 15 = 49 TCP connections
- Growth: 49 / 12 = 4.08, so about four more identical twelve-section cells fit before the TCP limit binds
The same 15 connections sit far below the module's documented CIP count of 128, so for this mix TCP binds first. Two assumptions move the result: a section built with more than one adapter multiplies its share, and every extra client draws from the same budget, so recount with the real adapter-per-section figure before ordering.
When does DeviceNet beat Ethernet for a section? #
Choose DeviceNet where a section is a small cluster of sensors, drives and operator devices rather than a rack of I/O: the network is capped at 64 nodes and its trunk is limited by baud rate, so 500 m of trunk is what you get at 125 kbit/s.
The rest of the baud table binds just as hard: 250 m of trunk at 250 kbit/s and 100 m at 500 kbit/s, individual drops limited to 6 m, and a 121-ohm terminator at each end of the trunk. The DeviceNet specification sets those figures. Budget the 24 V DC network power per section before the first one ships, and keep a documented node-address block per section so a replacement takes a free address instead of a neighbor's.
DeviceNet wins where a section is a handful of drives, sensors and stack lights hanging off short drops. It loses where a section carries a full rack of analog, because the network scan adds latency you do not tune per point; racks belong on the Ethernet case.
Is ControlNet worth the scheduling overhead for a movable cell? #
Pick ControlNet only when a fixed update window decides machine behavior, because the network runs at 5 Mbit/s over up to 1000 m of coax trunk with 99 nodes, and every change to a scheduled connection must be saved into a new network schedule before any node uses it.
Scheduled connections reserve bandwidth for update times you set, which is what makes ControlNet predictable and what makes every configuration change an event. Adding a section, retiring one, or retiming a connection requires the network schedule to be rebuilt and written to the nodes, so write that download into the relocation plan as a shutdown task rather than improvising it at the machine.
Weigh that overhead honestly. For sequences built on interlocks between sections with hard timing, the schedule buys a guaranteed window. For a cell that mostly gathers discrete I/O from sections that reposition now and then, the schedule is standing work taken on for little in return.
Should legacy Remote I/O stay on the list? #
Keep legacy Remote I/O only when the sections reuse installed 1771-style I/O or the plant crews already maintain that architecture, because the link runs at 57.6 or 115.2 kbit/s and maps every adapter into fixed rack and group addresses reserved in the scanner configuration.
A 1756-DHRIO module in the ControlLogix chassis provides the Remote I/O channels. Each adapter claims a quarter-, half- or full-rack image at a fixed rack and group address, so twelve reconfigurable sections need twelve address blocks reserved in the scanner configuration from day one. The scan handles discrete I/O over long distances comfortably; large analog blocks move slowly at that link speed, so keep heavy analog on the Ethernet sections.
The architecture earns its place when sections reuse existing 1771-style I/O blocks or plant crews already run and maintain Remote I/O. Otherwise it adds a scanner map and an addressing scheme the other three networks never ask for. A third-party Profibus DP scanner in the chassis is the same play for sections that reuse Profibus I/O; compare the protocols in how to choose between Modbus, Profibus and CANopen before committing to it.
How do you keep a section's identity separate from its position? #
Give every section a permanent address and a fixed interface map in the program, so a move changes one row of an assignment table instead of references scattered through the rungs.
Concretely: every section exposes the same fixed tag structure, its inputs, outputs and status. A position assignment table in the controller maps each section identity to the position it occupies this week, and the sequence logic reads only through that table. Moving section 7 into position 3 becomes one edited row plus the cable change; nothing else in the program moves.
Read symptoms with that split in mind before touching the network:
| Observed after a move | Most likely cause | First check |
|---|---|---|
| Section offline | Power, patch lead, or the address did not travel with it | Adapter status indicators, then its address against the controller configuration |
| Online but the wrong equipment responds | Position mapping, not the network | Trace one output from the assignment table to the field device |
| Failures follow one cable or port | Connector, patch lead or switch port defect | Swap lead and port one at a time until the fault moves |
| Trouble grows as sections are added | Address collision or the module's connection limit | Add sections one at a time and watch addresses and connection count |
Prove the whole workflow on one representative section, the one with the heaviest signal mix or the tightest response requirement, before ordering the other eleven. The commissioning discipline is the same as for any modular station; work through the remote I/O commissioning checklist for a modular station step by step on that pilot section.
What is the decision for each case? #
Order EtherNet/IP adapters for all twelve sections, add a DeviceNet drop only where a section is genuinely a small device cluster, specify ControlNet only for a sequence that needs a scheduled window, and scan legacy Remote I/O only against installed 1771 hardware.
Then by case:
- Sections that must appear on the plant network and feed SCADA: EtherNet/IP adapters, sized by the connection arithmetic above.
- Sections that are genuinely small device clusters: one DeviceNet drop per section, laid out inside the trunk length for the baud chosen.
- Sequences with hard update windows between sections: ControlNet, with the schedule download written into the relocation plan.
- Sections rebuilt from installed 1771-style blocks: legacy Remote I/O through a scanner module, addresses reserved up front.
A mixed cell takes EtherNet/IP for the racks and DeviceNet for the device clusters on the same switched backbone. Keep one boundary fixed no matter which network wins: standard remote I/O connection status reports a broken link, not an unsafe machine, so emergency stop and guard interlocks belong in a safety-rated design, as set out in selecting remote I/O architecture for a safety upgrade.
Questions asked
Does moving an EtherNet/IP section to a new switch port need reconfiguration?
No. The section's IP address and its controller connection travel with the adapter, so any free port on the same switched network works without configuration changes. The patch cable is the only thing that moves, so label both ends. If addresses come from DHCP, use a binding that hands the same address back to the same adapter, or set addresses statically so a moved section cannot arrive with someone else's address.
What happens if two sections power up with the same address?
The controller's connection lands on whichever adapter joined last: one section reports offline, or commands act on the wrong equipment. A duplicate IP address breaks address resolution for both EtherNet/IP adapters, and a duplicate node address on DeviceNet or ControlNet can quiet a whole trunk until the conflict clears. Assign each section an address from a documented block before it ships, and record the assignments so a replacement takes a free address.
Does a section with several adapters cost several connections?
Yes. Each adapter consumes its own TCP connection for implicit I/O messaging, so count adapters, not sections. A twelve-section cell built with three adapters per section costs 36 connections before any SCADA client or programming tool connects. Rerun the arithmetic with the real adapter count per section and the documented limits of the Ethernet module actually fitted, since the connection limit lives in that module.
Does a ControlNet reschedule interrupt the running network?
Nodes keep running their current schedule until a new schedule is downloaded to them, so a move does not stop the network mid-task. The schedule change does need a planned download to every node before new or retimed connections carry data, which is why it belongs in the relocation plan as a shutdown task. A physical relocation that adds no connection and gives the section an unused node address needs no schedule work at all.
Can a standard remote I/O network carry emergency stop signals?
No. A standard remote I/O connection reports communication status, which detects a broken cable but has no safety-rated fault behavior of its own. Emergency stop, guard interlocking and any other safety function need safety-rated I/O, a safety controller or safety-rated logic, and validation of the complete function as installed. Treat the network choice as a control question and keep the safety design separate.