Troubleshooting
DP/PA link in TIA Portal: GSD tool MLFB mismatch and the 2BA01 fix
Short answer
The GSD-tool workflow in TIA Portal V15 does not take the 6ES7153-2BA10-0XB0 IM153-2 directly, so the DP/PA link station never comes up. Siemens documents that MLFB as the spare-part successor of the earlier IM153-2, so configure the station as 6ES7153-2BA01-0XB0 or 6ES7153-2BA02-0XB0. The DP network then runs at 1.5 Mbit/s with the PA segment separate — no 45.45 kbit/s coupler-only setup needed.
On this page
- Confirm the fault is the configuration, not the hardware
- Why the 6ES7153-2BA10-0XB0 fails the GSD-tool station
- Configure the link under the compatible MLFB
- Why the coupler-only route pins the bus at 45.45 kbit/s
- Bus time for 32 cyclic bytes at 1.5 Mbit/s versus 45.45 kbit/s
- Verify online, then carry the project to the S7-1500
- Questions asked
Configure the DP/PA link station as 6ES7153-2BA01-0XB0 or 6ES7153-2BA02-0XB0 in the GSD tool, and the link comes up in TIA Portal V15: the DP network runs at 1.5 Mbit/s and each 6ES7157-0AC83-0XA0 module carries its own PA segment. The interface module you actually own, a 6ES7153-2BA10-0XB0, is the article number Siemens documents as the spare-part and functionally compatible follow-on of that earlier IM153-2, so the predecessor's entry describes the same station. Configuring the assembly under its own new MLFB is what fails in the tested V15 GSD-tool workflow. The fallback, a transparent coupler with the coupler and device GSD files installed separately, also brings the PA device up, but it pins the whole DP bus at 45.45 kbit/s and slows every other slave with it. The sections below separate the fault, apply the fix, and price the two routes in bus time.
Confirm the fault is the configuration, not the hardware #
Run these checks first; each one moves the diagnosis:
- The same assembly — one interface module, two coupler modules — works in SIMATIC Manager. A working station in STEP 7 v5.x clears the DP master, the PA instruments and the wiring, and leaves the TIA Portal V15 plus GSD-tool representation as the suspect.
- Confirm the interface module sees its rated supply; the 6ES7153-2BA10-0XB0 data sheet states 24 V DC as the rated value — and check both coupler modules for seating and feed while you are at the cabinet.
- Record the MLFB printed on the interface module, 6ES7153-2BA10-0XB0 in this build. The fix swaps the configured article number, so the project notes should state what is really mounted.
- If a quick transparent-coupler test with individually installed device GSDs brings the instrument up, the PA wiring and the instruments are proven. That route is the fallback priced in the worked example below.
Why the 6ES7153-2BA10-0XB0 fails the GSD-tool station #
TIA Portal carries no native hardware-catalog entry for the DP/PA link. Siemens' configuration note for the link routes TIA Portal users through the GSD tool, and a project carried over from STEP 7 v5.x needs that GSD material regenerated by hand. The tool then describes the station under the article numbers it holds, and in the tested V15 workflow the assembly configured under its own new MLFB never came up, while the same hardware configured under the predecessor entry did.
The substitution is documented, not a lucky workaround. Siemens' February 2015 bulletin for the revised ET 200M interface module names the 6ES7153-2BA10-0XB0 as the spare-part and functionally compatible follow-on of the earlier IM153-2, and the support answer to this fault spells out 6ES7153-2BA02-0XB0 as the predecessor to configure. A functionally compatible spare part answers the DP master as the old station did, so an entry written for the predecessor describes the hardware in the cabinet. The fault is an article-number mismatch between toolbox and device, not an unsupported device.
Configure the link under the compatible MLFB #
- In TIA Portal V15, switch to the project view and open the DP master system under the CPU. The tested bench ran a CPU 314C-2 PN/DP; the target machine runs an S7-1500.
- Install the link's GSD material through the GSD tool, the route Siemens' configuration note directs for the DP/PA link.
- Add the DP/PA link station under the DP master system and select the predecessor entry — the item printed as
2BA01(2), which covers both the 6ES7153-2BA01-0XB0 and the 6ES7153-2BA02-0XB0 builds. - Mount the two 6ES7157-0AC83-0XA0 coupler modules in the link's slots below the interface module, one slot per PA segment.
- Set the DP segment rate to 1.5 Mbit/s. The link terminates the DP side, so the PA segments no longer dictate it.
- Compile and download the hardware configuration, power the link, then go online and confirm the station reports healthy and each PA device exchanges cyclic data.
Worked this way, the tested case reports a DP network running at its configured rate with the PA segments separate, verified on both the CPU 314C-2 PN/DP bench and an S7-1500.
Why the coupler-only route pins the bus at 45.45 kbit/s #
A DP/PA coupler running without the link module is transparent: the DP cable and the PA cable form one electrically continuous bus, so every device on it must run the same bit rate. The bus-powered PROFIBUS PA physical layer, MBP per IEC 61158-2, runs at 31.25 kbit/s, and PA devices additionally accept 45.45 kbit/s, the one DP-listed rate they can follow. That is why the transparent route forces the DP master down to the PA-compatible rate, and it is exactly the throttle the tested fallback needed once the link hardware left the data path.
The link inverts the picture. The interface module terminates the DP side, and each 6ES7157-0AC83-0XA0 module clocks and feeds its own PA segment, so the DP side runs the rate you configured — the tested case set 1.5 Mbit/s — while every PA segment keeps its own.
If the transparent route is what fits the cabinet anyway — a lone PA cluster, no other DP slaves, refresh that tolerates the slow bus — the page on configuring a DP/PA coupler in standalone mode in TIA Portal walks that setup. Installing the coupler's GSD file separately from the device GSDs is part of that route, and the 6ES7157-0AD82-0XA0 coupler GSD file configuration page shows what such an installation involves.
One safety note: if the PA trunk reaches into a hazardous area, the segment's certified ignition-protection concept stands or falls with the coupler's power conditioning — this fault and its fix live in the engineering configuration only, so leave that hardware design untouched.
Bus time for 32 cyclic bytes at 1.5 Mbit/s versus 45.45 kbit/s #
Inputs, with where each comes from:
- Cyclic volume configured at the DP master for the station: 16 bytes in and 16 bytes out. Example figure — the reported project does not state its byte count, so substitute the total from your own module list.
- The two candidate rates: 1,500,000 bit/s, the tested link rate, and 45,450 bit/s, the transparent-coupler rate.
- The rule: PROFIBUS sends every byte as one asynchronous character of 11 bits — start bit, eight data bits, parity, stop bit — so wire time in seconds is bytes × 11 divided by the bit rate.
Arithmetic for one pass, both directions:
- 32 bytes × 11 bits per byte = 352 bits
- 352 bits ÷ 1,500,000 bit/s = 0.000235 s, about 0.23 ms
- 352 bits ÷ 45,450 bit/s = 0.00774 s, about 7.7 ms
- 1,500,000 ÷ 45,450 = 33, the ratio between the two routes
Result and decision: the station's cyclic data costs about 0.23 ms per pass on the link route and 7.7 ms on the coupler route, and that is user data only. Token rotation, polling frames and every other DP slave add character time of their own at whichever rate the bus runs, so the ratio is the point: the slow route multiplies each bus member's wire time by about 33. With this station as the DP network's only slave and a control loop that tolerates a 7.7 ms refresh, the transparent coupler is the smaller build. The moment a second DP slave joins the segment, or the loop needs better than roughly 8 ms, keep the link at its tested rate — the configuration the fix above delivers.
Verify online, then carry the project to the S7-1500 #
- Go online to the CPU and open the link station: the interface module and both coupler modules should sit without fault symbols, and the two PA segments should appear as separate branches under the station, not as one flattened bus.
- Compare the DP rate the bus is running online against the value you configured, then read one cyclic value from an instrument behind each coupler module and check it against the instrument's local indication — that proves the data mapping, not just the connection.
- Record the configured entry, the
2BA01(2)item, in the project notes so a restore or rebuild uses the same representation. - Keep the GSD files archived with the project. Version steps reopen GSD-based stations, and the DP/PA coupler GSD errors documented for a TIA Portal V18 migration are the family to expect, so recheck the station after any portal upgrade.
The reported case ran on a CPU 314C-2 PN/DP bench first and was then verified on an S7-1500, with both the link and the coupler configuration working. Before the link lands on the S7-1500 target, the CPU needs a PROFIBUS DP interface, and the article on connecting PROFIBUS devices to an S7-1500 without onboard PROFIBUS covers that step.
Questions asked
Why does the same DP/PA link work in SIMATIC Manager but not in TIA Portal V15?
STEP 7 v5.x carries native support for the DP/PA link, so the assembly configures there under its real article number. TIA Portal's hardware catalog has no entry for the link, and the V15 GSD-tool workflow does not produce a working station for the newer 6ES7153-2BA10-0XB0. Representing the station as its documented predecessor closes the gap.
What does the 2 in the entry name 2BA01(2) mean?
It is a variant digit: one catalog entry covers both builds, 6ES7153-2BA01-0XB0 and 6ES7153-2BA02-0XB0. Either entry describes the predecessor IM153-2 that the installed hardware replaces functionally, so take whichever one the GSD set on your engineering station offers. The tested project used the entry as the tool prints it.
Does the 6ES7153-2BA10-0XB0 module need a replacement or a firmware change?
No. The module stays exactly as installed; only the configured article number in the engineering project changes. Siemens documents this MLFB as the spare-part and functionally compatible follow-on of the earlier IM153-2, which is why the predecessor entry describes the hardware correctly — the device answers the DP master as the older station did.
How many PA segments can one DP/PA link carry?
One coupler module per PA segment: each 6ES7157-0AC83-0XA0 clocks and feeds its own segment, and the tested assembly runs two behind one DP station. All of them appear to the DP master as a single station, so extra segments cost no additional DP slave addresses.
What rate does a PA segment run at when the link is in place?
31.25 kbit/s, the bus-powered rate of the PROFIBUS PA physical layer defined in IEC 61158-2. Each coupler module clocks its own segment independently, so the DP network keeps the faster rate you configured. Only the transparent-coupler route drags the shared bus down to 45.45 kbit/s, because there both cable systems form one bus.