Why a CP 341 Modbus master returns status W#16#1E0D
Short answer
W#16#1E0D on a CP 341 Modbus master call means the serial transaction did not complete; on a link that once passed commissioning the fault sits on the Siemens side, in the cable path, or at the Schneider partner. Match the port variant from the order number, capture the line while real requests run, then use three laptop tests - passive monitor, slave simulator at the CP, master simulator at the Schneider PLC - to decide which side failed.

On this page
- What does status W#16#1E0D from a CP 341 Modbus master tell you?
- Which serial interface does your CP 341 order number carry?
- Can a voltmeter on an idle RS-485 line prove the link is dead?
- Which laptop test isolates the failing direction?
- Did the CP master actually send a request?
- What does each test outcome tell you to fix?
- Why does a link that ran for years suddenly stop?
- Questions asked
A CP 341 Modbus master that reports W#16#1E0D with ERROR = 1 has executed a serial job that did not complete. On a link that passed commissioning, that failure sits in one of three places: the CP side, the cable path between the cabinets, or the Schneider partner. A laptop decides which, in three roles: passive monitor on the live segment, slave simulator answering the CP, and master simulator polling the Schneider PLC. Before touching any connector, read the interface variant off the module order number, because the adapter that fits depends on it. And do not trust a meter reading taken on an idle line: at typical RTU polling rates the segment is busy about one percent of the time, so a healthy link looks dead to a voltmeter. The sections below give the order-number table, the timing arithmetic, and the decision each test outcome forces.
What does status W#16#1E0D from a CP 341 Modbus master tell you? #
W#16#1E0D is a status word generated by the Modbus master driver running on the CP 341: the communication call executed, ERROR is set, and the serial transaction behind the call did not complete - the number itself is decoded in the driver's status list, not in the standard STEP 7 code list.
The exact wording behind the number sits in the status table of the Modbus master loadable driver for the CP 341, and that list differs between driver versions, so read the one that matches the driver installed on your module before you quote a meaning to anyone. What the value decides in the field does not depend on that wording: the job reached the CP and failed there, so the hunt happens on the serial segment and at the partner, not in the ladder that called the function. The value alone is not a verdict against the Schneider PLC; assign the fault only after the isolation tests.
Capture STATUS per job while polling runs. Repeated transactions overwrite the previous diagnostic within milliseconds, and the value you read online after a minute of running describes only the last call.
In the installation behind this question, a redundant S7-400H drives CP 341s in ET 200M stations spread across the cabinets, one Schneider partner per CP-equipped cabinet. Commissioning passed years ago, so every element once worked; the three laptop tests below assign today's failure to one side.
Which serial interface does your CP 341 order number carry? #
Read the order number on the module itself: 6ES7341-1A... carries RS 232C (V.24), 6ES7341-1B... carries 20 mA TTY current loop, 6ES7341-1C... carries X.27 (RS 422/RS 485) - and all three variants run the same Modbus master driver.
| Order number | Electrical interface | Laptop connection |
|---|---|---|
| 6ES7341-1A... | RS 232C (V.24) | Plain RS-232 port, wired per the cabinet drawing |
| 6ES7341-1B... | 20 mA TTY current loop | A current-loop-capable interface only |
| 6ES7341-1C... | X.27 (RS 422/RS 485) | RS-485 converter across the two signal conductors |
Modbus defines the message exchange; the interface variant defines what reaches the wire. An RS-232 to RS-485 converter only helps when it faces an RS-485 port. A 20 mA current-loop port is a different electrical system, and no connector swap turns it into RS-485.
The interface type is printed on the module front. Read it together with the cabinet wiring diagrams, because the path to the Schneider partner can run through intermediate boxes holding terminals, jumpers or converters that other scopes have touched since commissioning.
Establish the topology before attaching anything: does each CP 341 own a private point-to-point segment to its Schneider partner, or do the cabinets share one multidrop pair? Six partners across six CP-equipped cabinets does not by itself establish one shared bus - inspect the boxes for daisy-chained terminals. On a shared pair, one laptop test touches all six links at once, and the CP masters' polling has to tolerate the extra receiver you add.
Can a voltmeter on an idle RS-485 line prove the link is dead? #
No - serial traffic lives for a few milliseconds per transaction, so an averaging meter on the segment reads almost nothing even on a perfectly healthy link; a static reading cannot decide the link is dead or alive in either direction.
Worked example: poll one Schneider register once per second at 19200 bits/s with 8-E-1 framing. The Modbus serial specification delimits RTU frames with 3.5 character times of silence, and one character at 8-E-1 is 11 bits ÷ 19200 bits/s = 0.573 ms, so that gap is 2.01 ms; an 8-byte request carries 8 × 0.573 = 4.58 ms of transitions and a 7-byte response carries 4.01 ms, which gives 4.58 + 4.01 + 2.01 + 2.01 = 12.6 ms per transaction. At one poll per second the segment transmits during 12.6 ms of every 1000 ms, about 1.3 percent of the time - so a meter averaging over tenths of a second sits at the idle level and reports nothing. Nothing on the meter is exactly what a working RTU segment looks like to a handheld DMM.
A measurement that means something is differential, taken across the two signal conductors while the PLC repeats transactions. The RS-485 standard (TIA/EIA-485) requires a receiver to decide correctly at ±200 mV between the conductors, so the meaningful reading is the conductor-to-conductor difference during a frame, never one conductor referenced to earth. Compare the transition at the CP connector with the same transition at the Schneider connector: activity at the CP end and silence at the partner end puts the break between the two probes.
An idle, biased segment holds a small steady differential voltage. That reading is only informative if it stays motionless through a triggered request - then you finally have a genuine no-signal result.
Check termination and bias against the documentation for the installed interface before adding anything; extra resistors load the line and can fight an existing bias network. Run continuity checks on an isolated, de-energized segment, and treat pulling connectors on a running redundant plant as a coordinated outage, not a quick probe.
Which laptop test isolates the failing direction? #
Three laptop tests decide it, in this order: a passive monitor on the live segment, a slave simulator answering the CP 341, and a master simulator polling the Schneider PLC - each completed test removes one whole side from suspicion.
- Passive monitor. Tap the live segment and watch while the PLC runs its polling. This shows whether requests leave the CP 341 and whether responses come back, without disconnecting anyone.
- Slave simulator. Disconnect the partner cable at the nearest accessible terminal and let the laptop answer the CP's requests. A complete request-and-response cycle proves the CP master, its driver and the cable up to the tap point.
- Master simulator. Disconnect the CP side and let the laptop poll the Schneider device with its configured slave address and function codes. A completed poll proves the partner responds independent of everything on the Siemens side.
A plain USB serial adapter is not automatically a passive analyzer: its receiver, termination and bias become part of the line. Use an isolated receive-only tap where the installation allows one; where it does not, rely on the two disconnect tests. One physical segment also serves one active talker at a time - the same principle that stops an S7-200 sharing one RS-485 port with a PC and Modbus, described in why an S7-200 cannot share one RS-485 port with a PC and Modbus.
Decode with Modbus-aware software, not a terminal emulator. RTU frames are binary, and a terminal program shows them as garbage characters; the monitor should display slave address, function code, data and the CRC check per frame.
Did the CP master actually send a request? #
Watch the communication call online while the port is monitored: if the call's request input never asserts and the segment stays silent, the fault is in the call conditions, the CP's parameter set or the DP path to the ET 200M - not in the Schneider PLC.
Run the polling loop, keep the programming device online at the call, and record DONE, ERROR and STATUS for individual jobs rather than the value that survives after several.
Check the CP before the wire: its entry in the hardware configuration, its diagnostic entries in the station, and the protocol parameter set assigned to it. A CP 341 sitting in an ET 200M is reached across redundant PROFIBUS DP, so a station fault blocks every serial job before Modbus begins. The parameter and wiring work for this kind of redundant master is stepped through in how to configure Modbus RTU on an S7-400H master over serial CPs.
Resist verdicts from indicator lamps. An LED that goes dark after a parameter change proves the symptom moved, not that a valid request and response now complete; compare current settings against the commissioning record, function code by function code.
What does each test outcome tell you to fix? #
Each outcome forces one decision: the table below names the side that failed and the next concrete action, so the laptop sequence ends in a repair rather than a guess.
| Laptop outcome | Failed side | Next action |
|---|---|---|
| No requests on the monitor while the call runs with its request set | CP side: call conditions, parameter set, CP health, DP path | Station diagnostics first, then the parameter set, then the call logic |
| Requests leave the CP, no response returns | Return path or the Schneider slave | Master simulator at the partner; if it answers, chase the return conductors between partner and tap |
| Slave simulator completes a full transaction with the CP | Neither Siemens side | Fault is beyond the tap: partner cabling and partner configuration |
| Master simulator gets answers from the Schneider | Not the partner | CP 341 side or its cable: inspect the path, re-transfer the parameter set |
| Both directions decode, but the partner replies with an exception frame | Configuration mismatch | Match slave address, function code, register span and serial parameters |
An exception response is good news about the wire: the request reached the Schneider and its firmware rejected it, so the work moves to the mapping and settings on both ends. Serial parameters deserve their own check, because a slave whose parity does not match its master silently drops every frame - the behavior documented in why a DL05 Modbus RTU slave answers only with odd parity is the clean example.
Why does a link that ran for years suddenly stop? #
A link that passed commissioning and then stopped points at change: re-parameterized or replaced Schneider devices, altered wiring in the intermediate boxes, swapped or de-powered converters - check what changed before touching the code that worked for years.
On the Schneider side, the usual changes are a parameter reload or firmware update that altered serial settings or the register table, and a replaced device that arrived with a different slave address or parity. In the cable path, intermediate boxes that belong to another scope get rewired, converters get moved to other power supplies, and bias networks lose their supply. On the Siemens side, a replaced CP 341 or a re-transferred hardware configuration can carry protocol parameters that differ from the commissioning record - compare them rather than assume.
The end state of the sequence: if all three laptop tests pass and the CP 341 still reports the status on the real line, put the passive monitor back on the segment while the CP runs, and compare frames byte for byte - slave address, function code, data and timing. The difference between what the CP sends on the live line and what the simulator sent on the bench is the fault, and it is one of the three things this page assigned: the CP's serial output, the path between the cabinets, or the Schneider's answer.
Questions asked
Can I clip the laptop onto the RS-485 segment without stopping the plant?
Only with care. Use an isolated converter, connect across the two signal conductors, and leave the existing termination and bias untouched. A USB adapter adds its own receiver load and can shift the electrical picture, and a laptop power supply can earth the shield through the measurement setup. If a clean tap is not available, use the two disconnect tests instead.
What settings does the laptop simulator need to match?
The baud rate, parity and stop bits configured in the CP 341 parameter assignment, plus the slave address you want to exercise. Register numbering conventions differ between documents: a holding register shown as 40001 is polled as address 0 with function code 03. If you cannot copy the CP's exact parameter set from the project, read it from the hardware configuration before testing.
The Schneider answers the laptop but rejects the CP 341 - what does that mean?
The wire and the partner are working; the request content is not. Capture the CP's frame and the Schneider's reply: an exception response carries the function code with its high bit set plus a reason code, for example 02 for illegal data address. Compare the slave address, function code and register span in the CP's request against the Schneider's configured data table.
Frames decode cleanly on the monitor but the partner still misses some - what then?
Suspect the electrical helpers in the path. Repeaters, powered converters and shared bias networks delay the line's turnaround, and Modbus RTU framing depends on a silent gap between frames that those delays can violate. Bypass the suspect box with a direct cable for one test; if every poll then completes, replace or re-power the converter rather than touching either PLC.