What a Danfoss FC200 on PROFIBUS needs from TIA Portal
Short answer
A PROFIBUS link in TIA Portal moves words; it does not make the drive ready to run. Before the FC200 answers a PLC command you need the verified GSD for the installed PROFIBUS option, one unique station address, an agreed cyclic layout of control word and reference out and status word and actual value in, motor data and limits already set at the drive, and a configured response to bus loss. The deciding check: command, status word and actual speed agree at every stage.
On this page
TIA Portal builds the bus; the drive decides whether to run. A Danfoss FC200 on PROFIBUS answers a PLC command only after five agreements are in place: a verified GSD for the communication option actually fitted in the drive, one unique station address, an agreed cyclic layout — control word and reference to the drive, status word and actual value back — motor data and limits already entered at the drive itself, and a configured response to bus loss. Get those five right and commissioning reduces to one check repeated at each stage: the command you send, the status word the drive returns and the speed the shaft reaches must agree. Miss one and the symptom misleads — the bus can look healthy while the drive sits stopped, or the drive can run on limits nobody verified.
The bus link and the drive are two different jobs #
PROFIBUS DP is cyclic: once per bus cycle the controller writes its output data to the station and the station returns its input data. A green station in TIA Portal's online diagnostics proves that addresses, device description, module selection and cabling agree — nothing more. It does not prove the drive's control source points at the bus, that anyone entered the motor data, or that the drive's limits protect the motor it is driving. Keep the layers apart: network availability, permission to run and power-stage protection are three separate jobs, and a bus setting repairs neither of the other two. That separation is what makes the fault table near the end of this article usable — every symptom lands in one layer first.
The five agreements to get in place #
Each agreement exists on both the drive side and the project side, and the two sides must match exactly. Before anything else, record the drive's type code, the communication option's identification and the firmware versions from the nameplate and the drive's information menus; every manual, GSD and programming guide you open next is chosen by those three facts.
The device description matches the fitted option #
An FC-series drive takes its PROFIBUS interface from a slot-in communication option — for this family, the VLT PROFIBUS DP MCA 101, whose installation guide covers fitting and wiring; confirm the option you actually have against the identification you recorded. TIA Portal cannot describe the station until a GSD file is installed. A GSD is a plain text file that tells the engineering tool which module layouts the option accepts, how many words each carries and how the data must be transferred. Take the file for your drive family and option from Danfoss's official fieldbus-configuration download page, install it through TIA Portal's device-description management, then insert the station from that entry. A GSD copied from another drive family or an old project installs without complaint and then offers the wrong module list — a classic cause of a station that connects but exchanges no usable data.
One station address, set once #
The address lives on the drive side: set it the way the option's installation guide shows, with its switches or through the drive's parameter set, then enter the same number on the station's interface settings in TIA Portal. For example, put address 4 on the option and enter 4 in the project. Two stations sharing one address on a segment produce dropouts that wander and get misread as cable faults, so settle the address before touching anything physical.
A cyclic layout both sides expect #
Select the station's modules in TIA Portal from the installed GSD, and pick the layout the drive-side configuration expects. The basic Danfoss drive profile carries one control word and one reference to the drive and returns one status word and one actual value; longer layouts add more process words, and some add a parameter-access channel beside the cyclic words. Take the layout from the option's programming guide, not from an unrelated drive example — bit meanings and word order are defined per profile. For any multiword selection, transfer the data as one consistent block, so a reader never catches half an updated value.
Motor data and limits entered at the drive #
Enter the motor data from the nameplate, the current limits, the ramp times and the stop mode at the drive itself, and prove the drive runs the motor correctly under the maker's local commissioning method before the bus takes command. The bus carries the run command and the reference; it carries neither the motor data nor the limits. One safety sentence belongs here: PROFIBUS DP data exchange is not a safety layer, so the emergency stop and any safe-torque-off function stay on their own hardwired inputs no matter how well the bus runs, and the first remote tests happen with the machine secured for commissioning.
A bus-loss response agreed on both ends #
Both ends time the exchange: the controller's watchdog and the drive's communication-monitoring function. Set the drive's response — coast, ramp to a stop, or hold the last reference — to what the machine's risk assessment demands when the command disappears, and set the controller's watchdog so both sides declare the loss at about the same moment. Hold-last-reference carries a fan or pump through a momentary glitch; a coast stop is right only where an uncontrolled stop cannot endanger anyone. This is a drive setting with a defined behavior; the project file cannot supply it.
The cyclic words, counted #
Count the basic profile before you wire or download anything. The output side is one control word plus one reference word: 16 + 16 = 32 bits, and 32 ÷ 8 = 4 bytes. The input side is one status word plus one actual-value word: the same 4 bytes. Every bus cycle therefore moves 2 output words and 2 input words — 4 words in all — and those counts must match the module selection on both sides.
When you insert the station, TIA Portal assigns the I/O addresses; in this example the project shows the control word at QW256, the reference at QW258, the status word at IW256 and the actual value at IW258. Your own addresses will differ with the controller and the modules chosen — record them, because they are the PLC-side handles for the whole test. Reference scaling belongs to the layout too: the option's programming guide defines the reference word, and it may be a percentage of the drive's configured maximum rather than a speed in engineering units. Confirm the scaling and the sign before sending the first nonzero value.
The control word is a state machine, not a start button #
The reference does nothing until the control word walks the drive through its states: readiness, enable, run, and the stop and fault paths beside them. A drive receiving a nonzero reference while its enable conditions are unsatisfied stays stopped, and a ready indication in the status word is not proof the shaft is turning — read the documented running bits and the actual value separately. The drive's control source must also point at the bus option, or the best-written control word lands nowhere. The discipline is the same across drive families: the walkthrough of Danfoss VLT5000 DeviceNet control words from a PLC-5 shows the same control-word-versus-state pattern on an older Danfoss bus. When data moves but the setpoint or control word never takes effect, the checklist for missing setpoint and control word writes to a PROFIBUS drive is the fastest path to the cause.
Bus symptoms against drive symptoms #
| Symptom | Layer | Deciding check |
|---|---|---|
| Station never appears in online diagnostics | Network | Address uniqueness, option interface power, cable continuity, termination at both segment ends |
| Station present, no input or output data | Configuration | Module selection against the GSD, addresses inside the controller's process image |
| Data moves, drive stays stopped | Command | Control source at the bus, control word state satisfied, external permissives |
| Drive turns at the wrong speed or direction | Reference | Scaling and sign of the reference word against the drive's displayed reference |
| Drive trips as load or running time grows | Electrical | Output current against drive and motor ratings, thermal counters, mechanical load |
| Dropouts that wander along the segment | Physical | Shield bonding, connectors, both terminations, duplicate station address |
Read the drive's own fault text and diagnostic record before resetting anything. A thermal trip tracks accumulated heating, cooling conditions and the configured motor model; a communication fault tracks missing or invalid data. Capture what the PLC saw and what the drive saw at the same moment — a bus interruption and the overload it merely revealed look identical if you log only one side. A station that is present but silent has its own pattern on Siemens controllers: the walkthrough of an S7-300 PROFIBUS gateway detected but reading no I/O data begins at the module address. For the wandering-dropout row, the work is physical: inspect shield bonding and connectors, recheck both terminations, and keep the bus cable separated from power conductors — the NEC Article 800 communication cable separation requirements cover that principle.
The three-way check, stage by stage #
Commission in stages, and at each stage demand agreement between three readings: the command you sent, the status word the drive returned and the physical response. Stage one, bus up: online diagnostics show the station exchanging data. Stage two, stopped: write the stop-state control word, confirm the drive's display of received control data matches it, and check the status word returns the corresponding state. Stage three, low speed: send a small reference, confirm the drive shows the reference you intended, and watch the actual value track the shaft at the speed and direction you expected. Stage four, loaded: the output current settles inside the limits you set and the thermal counters stay calm. A stage where the three readings disagree points at one layer in the table above; fix that layer before moving on.
The decision #
An FC200 that satisfies the five agreements and passes the four stages is ready for the PLC to own: the project file describes the fitted option, the addresses are unique, the cyclic words mean what both sides think they mean, the drive's limits come from its own configuration, and a lost bus produces the stop the machine was assessed to need. If the bus is up but the drive ignores you, the fault is in the command layer, not the cable; if the drive trips under load, the fault is electrical, and no GSD or module list will fix it. Decide by layer, and commissioning shortens to exactly the checks the table names.
Questions asked
Which PLC interface can act as the PROFIBUS DP master for the FC200?
A CPU with a built-in PROFIBUS DP interface is the master by itself. A controller without one needs a DP master communication module, and it is that module's bus capability, not the CPU's order number, that decides the transmission rate and the number of stations you can run. Configure the master on the interface that actually carries the cable; a master entry created on an interface with no hardware behind it compiles cleanly and finds no station.
Can the drive start from the bus if nothing else is wired to it?
Only if the drive's control and reference sources are configured to the fieldbus option, and even then the hardwired inputs keep their precedence: an emergency stop, a safe-torque-off input or a local/remote selector overrides the bus regardless of what the control word says. Treat the bus as one command source among several, not as the replacement for the machine's own stop and enable wiring.
How do I find the right scaling for the reference word?
The option's programming guide defines the scaling for the profile you selected. To pin it down on your own configuration: set a known maximum reference at the drive, send a small value from the PLC, and compare the word you wrote with the reference the drive displays as received. That pair of readings gives the conversion and the sign convention for your exact setup before you let the drive run unattended.
How do I prove the configured bus-loss response works?
During commissioning, with the machine secured for that test, break the exchange deliberately: stop the master's interface or separate a connector the installation guide permits, and watch the drive. It should enter its configured response within the timeout you set, and the drive's diagnostic record and the PLC's diagnostics should each log the loss. Note the actual stopping behavior, not the parameter value: the parameter says what should happen, the test shows what does.
Does anything change if the FC200 is on PROFINET instead?
The five agreements stay; the objects change. A PROFINET option uses a GSDML device description instead of a GSD file, a device name and an IP address instead of a station address, and its own programming guide defines the cyclic layout. The word-level discipline, control word and reference out and status word and actual value in as one consistent block per update, carries over unchanged.