ControlNet and the ControlLogix platform have no passive global status word. Schedule produced and consumed tags — up to 15 consumers per producer at a 20–100 ms RPI — as the closest replacement, and pre-allocate spare bits because a structural change forces a re-schedule that drops every processor on the segment to Program mode. Use unscheduled MSG reads only for roughly five peers or fewer.
On this page
No — ControlNet and the ControlLogix instruction set have no passive global status word, and none can be enabled. The closest replacement is a scheduled produced/consumed tag pair that carries each controller's mode and fault bits, running at a 20–100 ms RPI with up to 15 consumers per producer. If you will not schedule the network at all, unscheduled MSG reads of a status word will do, but roughly five peers is the practical ceiling. Either way, pre-allocate spare bits in the produced tag before the first schedule is saved: a later structural change forces a ControlNet re-schedule that puts every processor on the segment into Program mode.
What the DH+ global status word gave you #
Each PLC-5 or SLC 5/04 on DH+ wrote one 16-bit status word onto the link, and token passing delivered every peer's word to every other peer. Each controller ended up with one word per node address in its global status file, with no MSG instructions and no connections to manage. Run, fault and mode bits were then just bit examines on that file.
ControlNet carries data only on scheduled or unscheduled connections, never on a word riding the media-access token, so a message-free broadcast cannot exist there. Everything you build is a connection, which makes the design a choice between the two kinds. The token is shared airtime, by the way — the same root cause behind why online editing slows a DH+ network: one node's long transmission delays every other node's turn.
Replace it with produced and consumed tags #
This is the committed replacement: every controller produces its own status word, exactly as each DH+ station broadcast its own. The produced and consumed tags practice manual, 1756-PM011, documents that each of these exchanges uses real controller connections and that the count rises as consumers are added, so budget them as part of the design.
- In each controller, create a controller-scoped tag — illustrative name
GSW_Status, type DINT, reset to 0 at download. - Populate it every sweep from the controller's mode and fault status, read from the controller object, and OR in your application bits. Keep the low 16 bits on the legacy decode so ported compare rungs do not change:
| Bits | Meaning |
|---|---|
| 0 | Run |
| 1 | Run, outputs disabled |
| 2 | Program |
| 3 | Major fault |
| 4–15 | Application-defined |
| 16–31 | Spare headroom |
- Open the tag's Properties dialog, mark it produced, set the connection count to the number of consumers (15 is the ControlNet ceiling per producer), and set the RPI to 50 ms.
- In each consumer, create a consumed tag of the same name and type, pointed at the producer's tag.
- Go online in RSNetWorx for ControlNet and save the schedule so a keeper module holds it — the same schedule that governs remote I/O scans on the segment, the one at issue in troubleshooting ControlNet scanning of legacy 1771 specialty I/O.
- Point the old GSW compare rungs at the consumed tag's bits; nothing else in the logic changes.
- Switch the producer to Program mode and confirm the consumer latches bit 2 within one RPI.
Pre-allocate the spare bits before the first schedule #
Changing a produced tag's type, size or connection count — or adding a consumer — forces RSNetWorx to re-schedule the segment, and every processor on it goes to Program mode while the new schedule takes hold. Plan that event for a production stop, because outputs drop on every node, not only the one you edited.
After the four status bits, a DINT still has 28 unused bits: a later battery-low or keyswitch bit is a re-assignment inside an unchanged tag, which needs only a program download. Set the connection count for the final controller count, not today's, for the same reason.
The schedule-free option: MSG reads #
If the network must stay unscheduled, each controller maintains the same status DINT without producing it, and the peers poll it with CIP reads over unscheduled bandwidth at a 200–500 ms period. Staleness equals the poll period, and in a full mesh the read count grows fast: six controllers means 30 reads per cycle. Treat five peers as the working ceiling — beyond that, poll latency and connection housekeeping cost more than the schedule does.
Staged plants keep PLC-5s on DH+ for a while. The status a PLC-5 writes to its global word also exists as ordinary register data, so a ControlLogix can read it across a DH+ bridge with a MSG read — the routing is the one covered in how to route a ControlLogix MSG to a PLC-5 over DH+ — and fold those bits into the produced DINT so ControlNet consumers see one uniform status set.
Worked example: six controllers at a 50 ms RPI #
Six ControlLogix controllers on one segment replace a six-node DH+ GSW scheme.
- Each produces
GSW_Statusas one DINT: 32 bits ÷ 8 = 4 bytes per tag. - Connection count per producer: 6 − 1 = 5 consumers.
- Scheduled status payload: 6 tags × 4 bytes = 24 bytes per update cycle.
- Worst-case detection of a producer fault: one RPI = 50 ms.
The MSG alternative at the same plant size: every controller polls its 5 peers every 250 ms, so 6 × 5 = 30 unscheduled reads per cycle, and worst-case staleness is 250 ms ÷ 50 ms = 5× the produced-tag latency. At six controllers, schedule the tags; the polling scheme buys no determinism and pays in latency.
Choosing between them #
| DH+ global status word | Produced/consumed tags | MSG reads | |
|---|---|---|---|
| Delivery | Token-passed broadcast | Scheduled, producer-driven | Unscheduled request/response |
| Worst-case detection | One token rotation | One RPI (20–100 ms) | One poll period (200–500 ms) |
| Schedule required | No | Yes | No |
| Practical peer count | Every node on the link | Up to 15 consumers per producer | About 5 |
| Structural change penalty | None | Re-schedule; all processors to Program mode | Program download only |
Decide by case. Five peers or fewer, 200–500 ms detection acceptable, and no scheduling wanted: poll with MSG reads. Deterministic detection, more than five peers, or logic that acts on a peer's mode and fault bits: produced and consumed tags at a 50 ms RPI. Mixed DH+ and ControlNet: bridge-read the PLC-5 words and re-produce them on ControlNet. If the segment later becomes EtherNet/IP, the same produced and consumed tags carry over with no network schedule to save.
Verify the exchange after scheduling #
- On each consumer, the connection for the consumed tag shows Running with a connection size of 4 bytes — one DINT.
- Switch a producer to Program mode; its consumers must latch bit 2 within one RPI.
- Drive the fault bit from logic during commissioning and confirm bit 3 arrives within the same interval.
- Run the ControlNet bandwidth report and keep scheduled bandwidth below about 80%, leaving unscheduled time for MSG traffic and uploads.
Questions asked
Can ControlNet pass processor status without any messaging or scheduling?
No. No passive status broadcast exists on ControlNet or in the Logix instruction set, so status is always a connection you configure. The only schedule-free path is unscheduled MSG reads of a status word each controller maintains. If you want the message-free feel of the old word, that is exactly what scheduled produced and consumed tags recreate, at the cost of saving a network schedule.
What exactly triggers the re-schedule that drops processors to Program mode?
A change to a produced tag's data type or size, its connection count, or the set of scheduled connections on the segment. Re-assigning bits inside an already-produced DINT needs only a program download, because the tag's size on the wire is unchanged. Only scheduled items cause this; changes to unscheduled MSG polls never re-schedule anything.
What RPI should a status tag use?
Use 50 ms for supervisory logic that reacts to a peer's fault or mode change, 20 ms when interlocks act on a peer's status, and 100 ms when the word only feeds indication. Worst-case detection equals one RPI, so the choice reduces to how stale a peer's status may be before your logic must see it.
How many controller connections does the replacement use?
Each consumed tag is one connection on the consumer, and a produced tag holds one connection per consumer it serves. In a six-controller scheme each processor carries six: its own produced tag plus five consumed tags. The produced and consumed tags practice manual, 1756-PM011, covers budgeting these against the controller's connection limit.