How-to
Parameterizing SIMOCODE devices over PROFIBUS DP from STEP 7
Short answer
SIMOCODE parameterization from STEP 7 works only with SIMOCODE ES 2007 Premium and the STEP 7 integration option selected at setup, which lets the PROFIBUS DP master send your stored parameter set at every bus startup and rebuild a replacement basic unit from its DP address alone.
On this page
- Which SIMOCODE software edition can parameterize from STEP 7?
- How does SIMOCODE parameterization over PROFIBUS DP actually work?
- How do I install SIMOCODE ES so HW Config can open the devices?
- What is the procedure to parameterize a SIMOCODE in HW Config?
- Can I parameterize a SIMOCODE over PROFIBUS without downloading the PLC?
- Why do my SIMOCODE settings revert after a bus restart?
- How do I parameterize a replacement SIMOCODE basic unit?
- Questions asked
Yes, you can parameterize SIMOCODE feeders from STEP 7, but not with every software package that happens to be on the bench: SIMOCODE ES 2007 Premium with the STEP 7 integration option selected at setup is what makes the devices editable inside HW Config. Once that integration is in place, the CP 6GK7 443-5DX05-0XE0 acting as PROFIBUS DP master transfers the configured parameter set to each SIMOCODE automatically at bus startup or power-on, which is also what saves you on the day a basic unit fails and has to be replaced.
Which SIMOCODE software edition can parameterize from STEP 7? #
SIMOCODE ES 2007 Premium with the STEP 7 integration option selected during setup is the edition that parameterizes from STEP 7; the SIMOCODE ECS 2007 + SP6 edition that often sits on the same bench reads the device but does not integrate into HW Config. The edition label is not cosmetic: ECS covers standalone commissioning work with the device, while ES Premium adds the option during installation that plugs the parameterization tool into the controller project. Without that option, HW Config shows the station through its GSD description but has nothing to open when you want to edit protection settings.
Check the installed software before you promise anything. If the program entry reads SIMOCODE ECS 2007 + SP6, the integrated route is unavailable until the Premium ES package is installed with integration selected. Also check the project itself: a PLC program backup proves the controller logic exists, not that the editable SIMOCODE configuration is in it. Open the hardware configuration and see whether the feeder carries an integrated SIMOCODE object or only a GSD-based station definition. One project can identify the device for PROFIBUS communication and still hold none of its parameters.
How does SIMOCODE parameterization over PROFIBUS DP actually work? #
Parameterization over PROFIBUS DP is a one-shot acyclic transfer at station initialization: the DP master sends the stored startup parameter set to each SIMOCODE when the bus starts or the basic unit powers on, and cyclic process data runs separately after that. Cyclic exchange carries the everyday traffic, meaning commands, status words and measured current. Parameterization carries the settings that decide how the device protects and controls the motor: trip behavior, rated data, input and output function assignment.
The consequence is that two copies of every setting exist at all times: one in the device, one in the master project. Every bus startup or power-on makes the master re-assert its copy. If you only ever look at cyclic data, a feeder can communicate perfectly while running on parameters nobody intended, so the readback in the last section below is not optional bookkeeping.
How do I install SIMOCODE ES so HW Config can open the devices? #
Install SIMOCODE ES 2007 Premium and select the STEP 7 integration option during setup; once that option is ticked, the SIMOCODE parameterization tool opens directly from the device in the CP's PROFIBUS DP master system in HW Config. This works for SIMOCODE pro devices, including the pro V models, because the ES tool is designed to be called from the controller's hardware configuration rather than from a separate project world. If the option was missed during the original installation, rerun the ES setup and select it; the integration appears in HW Config afterwards without changes to the PLC program.
What is the procedure to parameterize a SIMOCODE in HW Config? #
The procedure is seven steps: back up and read back, install the right edition, walk to the device under the DP master system, edit, compile, download, then restart and read back. Working through them in order is the whole job, and each step ends with something you can check.
- Save a working copy of the PLC station project and read the current parameters out of the device, so you hold a recoverable baseline of both the project and the feeder.
- Check the installed software. If it shows SIMOCODE ECS 2007 + SP6, install SIMOCODE ES 2007 Premium and select the STEP 7 integration option during setup.
- Open the S7-400 hardware configuration in HW Config, find the CP 6GK7 443-5DX05-0XE0, and follow its PROFIBUS DP master system to the SIMOCODE station; the same walking-a-bus-in-the-project logic is described for another controller family in the article on connecting PROFIBUS devices to an S7-1500 without onboard PROFIBUS.
- Confirm the DP address stored in the project matches the address set on the physical device before you edit anything.
- Open the integrated SIMOCODE parameterization from that station and enter the settings for the connected motor. Take trip data and control functions from that feeder's own equipment documentation, not from a copy of a neighboring feeder.
- Save and compile the hardware configuration, clear any configuration errors it reports, and download the changed project to the controller under your site's change procedure.
- Power the bus or the basic unit down and up under controlled conditions, then read the parameters back online and compare them with the project record.
Can I parameterize a SIMOCODE over PROFIBUS without downloading the PLC? #
Yes: with the Premium edition you can parameterize directly through a PC cable or over PROFIBUS itself, writing the device without downloading the PLC project and without putting the controller through STOP/RUN, which is exactly why this route suits commissioning. Adjusting a trip setting mid-commissioning does not cost a controller download, and it is legitimate to keep working this way after commissioning too.
One safety point belongs here: a SIMOCODE download can change trip class and overload protection on a live motor feeder, so make the change with the motor stopped and treat it as a change to the machine's protection function, not as a communications edit.
Why do my SIMOCODE settings revert after a bus restart? #
Your settings revert because two parameter copies exist: the direct download changed the device, but the older startup parameter set is still stored in the master project, and at the next initialization the DP master sends that stored copy over your changes. This happens whether the master's copy came from an integrated ES configuration or from a plain GSD-based definition. The bus looks healthy the whole time, because communication and parameter correctness are independent faults; the family of faults where master and slave disagree at initialization is covered for PROFINET in why a pingable PROFINET gateway reports a parameterization error.
The fix is to make one copy authoritative. Either bring the HW Config project to the same values you downloaded directly and send it to the controller, or use the SIMOCODE ES option that blocks the startup parameter set from overwriting a direct download, and then prove the choice by cycling power and reading the parameters back. If the project is authoritative, every future bus startup and every future replacement inherits your intended settings without further laptop work.
How do I parameterize a replacement SIMOCODE basic unit? #
Set only the PROFIBUS DP address on the replacement basic unit, with the addressing plug where the device supports one, and the DP master parameterizes it automatically at bus startup or power-on, so no laptop visit to the feeder is needed. This is the payoff of the integrated route: STEP 7 holds the startup parameter set, and the master delivers it to whatever device occupies the configured station.
Worked example: suppose the CP 6GK7 443-5DX05-0XE0 sits at PROFIBUS address 2 and eight SIMOCODE feeders are planned at addresses 10 through 17. The station count is 17 − 10 + 1 = 8 feeders; PROFIBUS DP gives slaves the range 3 to 125, so every feeder address is valid and none collides with the master at 2. When the feeder at address 13 fails, set the addressing plug on the spare basic unit to 13, insert it, and let startup parameterization load the project's stored set. The readback should then show address 13 carrying exactly the parameters recorded for that feeder. If the readback shows anything else, the project copy is not authoritative and section six above applies.
Questions asked
Can I load SIMOCODE parameters without a PC at the feeder?
Yes. The SIMOCODE pro system manual documents downloading parameters to the basic unit from a memory module, and an initialization module can already carry the saved parameter set. That gives you a swap procedure with no engineering laptop at the feeder: prepare the module at your desk, insert it into the replacement basic unit, let it transfer the parameters, then verify by reading them back online.
Does this change if I use TIA Portal instead of classic STEP 7?
The flow described here belongs to classic STEP 7 V5, such as STEP 7 Professional 2010, with SIMOCODE ES 2007 Premium. SIMOCODE ES also exists inside TIA Portal, where it supports newer SIMOCODE hardware and the device is configured in the portal's own device and network view instead of HW Config. The principle stays the same: the engineering tool holds the parameter set the master transfers at startup.
What is the difference between a GSD and the integrated SIMOCODE configuration?
A GSD file only describes the station to the DP master, meaning how much data it exchanges and at which address, so a GSD-based device in HW Config identifies the feeder but exposes no editable SIMOCODE parameters. The integrated ES configuration carries the full protection and control parameter set. A PLC backup can contain the first kind and still lack the second.
Do I need anything different if the plant runs PCS 7?
In a PCS 7 plant, use the SIMOCODE pro library instead of hand-wiring the STEP 7 route: its motor blocks are linked to the device by drag and drop, and the blocks operate with SIMOCODE pro devices on PROFIBUS DP. Parameterization still follows the same principle of the master transferring the stored parameter set at startup.